Runoff Requirements 1.67 Cpk on critical features Tooling 21 tools Special tooling: finish bore for crankshaft alignment, finish, bearing bore and flange hub O.D., flange undercut, flange chamfer, rough thrust face, rough, semi...
Machines 1 J88 / Stand-alone installation Runoff Requirements 10 continuous pieces Cpk > 1.96 and PC% 51%. Process capability run 32 PC, 8 hours, Cpk > 1.47 and PC% 68% Tooling 9 tools Parts Automotive...
Engine cylinder head (2) Machines 1 A77 5-axis / Stand-alone installation Runoff Requirements 1.67 Cpk on all features Tooling 30 tools Special tooling: High-speed drills (700 sfm), approximately...
Steering Knuckle Tooling 12 tools Special tooling: Combination tool to drill, face chamfer and circle interpolate back side chamfer. 1:6 taper drill. Face and back side debur tool. Machines 24...
Runoff Requirements 10-piece run to 1.96 Cpk. 25-piece run to 1.47 Cpk 50-piece run to 1.47 Cpk and a second 50-piece run to 1.47 Cpk Machines 12 A66 / System installation Tooling 88 tools Special...
Part Cycle Time/Volumes 13.94 minutes / 32,900 parts per year Operation 2, Op 10= 31 features, Op20 = 81 features Machines 3 A55E’s in a Gantry Cell Tooling All fine bores are processed using...
The objective of the demonstration is to highlight a feature on the U53 that gives the operator the option to “burn†the slug left behind while the geometry is still being machined. The objective of the demonstration is to highlight a feature on the...
The objective of the demonstration is to show 3-axis contouring with Super Geometric Intelligence machining. FORGING AHEAD SNC Demo Summary The objective of the demonstration is to show 3-axis contouring with Super Geometric Intelligence machining. Process...
The whole industry seems to be discussing this topic. Here’s what Modern MachineShop has to say about "Graphite Milling Shifts Into High Gear". GRAPHITE MILLING SHIFTS INTO HIGH GEAR The whole industry seems to be discussing this topic. Here’s what Modern...