Search

Results for "yahoo邮箱登陆阿里云咨询微信号:4826193 搜索引擎提取关键词,松原市google maps china in english"

Introducing Makino’s New UP6 HEAT Wire EDM Designed for Ultra Precision Machining

MASON, Ohio – June 15, 2018 –Introducing the new UP6 HEAT Wire EDM machine designed for Ultra Precision machining. The new machine is capable of achieving work piece positional accuracies of 1 micron (0.00004”) while providing X/Y/Z travels respectively of 650 x 470 x 320mm (25.59”...


The Advanced High Speed Machining Process

The objective of the MC1010-5X demonstration is to exhibit the combination of thin wall machining and 5-axis contouring.   Impeller Part Demo Summary The objective of the MC1010-5X demonstration is to exhibit the combination of thin wall machining and 5-axis contouring....


Makino Names Guitrau Western Regional Manager

E. Bud Guitrau has joined the growing staff of Makino as Western Regional Sales Manager for the EDM Group.   MAKINO NAMES GUITRAU WESTERN REGIONAL MANAGER Heads Up Regional EDM Sales Group MASON, OH – June 2006 – E. Bud Guitrau has joined the...


Crankcase

Runoff Requirements 1.67 Cpk on critical features Tooling 21 tools Special tooling: finish bore for crankshaft alignment, finish, bearing bore and flange hub O.D., flange undercut, flange chamfer, rough thrust face, rough, semi...


Engine Block 2

Machines 1 J88 / Stand-alone installation Runoff Requirements 10 continuous pieces Cpk > 1.96 and PC% 51%. Process capability run 32 PC, 8 hours,  Cpk > 1.47 and PC% 68% Tooling 9 tools Parts Automotive...


Engine Cylinder Head 2

Engine cylinder head (2) Machines 1 A77 5-axis / Stand-alone installation Runoff Requirements 1.67 Cpk on all features Tooling 30 tools  Special tooling: High-speed drills (700 sfm), approximately...


Steering Knuckle

Steering Knuckle Tooling 12 tools  Special tooling: Combination tool to drill, face chamfer and circle interpolate back side chamfer.  1:6 taper drill. Face and back side debur tool. Machines 24...


Transmission Case

Runoff Requirements 10-piece run to 1.96 Cpk. 25-piece run to 1.47 Cpk  50-piece run to 1.47 Cpk and a second 50-piece run to 1.47 Cpk Machines 12 A66 / System installation Tooling 88 tools  Special...


Transmission Case 2

Part Cycle Time/Volumes 13.94 minutes / 32,900 parts per year Operation 2, Op 10= 31 features, Op20 = 81 features Machines 3 A55E’s in a Gantry Cell Tooling All fine bores are processed using...


Tall Workpieces Can Easily be EDMed

The objective of the demonstration is to highlight a feature on the U53 that gives the operator the option to “burn” the slug left behind while the geometry is still being machined.   The objective of the demonstration is to highlight a feature on the...


More Results

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60