Runoff Requirements 10-piece run to 1.96 Cpk. 25-piece run to 1.47 Cpk 50-piece run to 1.47 Cpk and a second 50-piece run to 1.47 Cpk Machines 12 A66 / System installation Tooling 88 tools Special...
Part Cycle Time/Volumes 13.94 minutes / 32,900 parts per year Operation 2, Op 10= 31 features, Op20 = 81 features Machines 3 A55E’s in a Gantry Cell Tooling All fine bores are processed using...
The objective of the demonstration is to highlight a feature on the U53 that gives the operator the option to “burn†the slug left behind while the geometry is still being machined. The objective of the demonstration is to highlight a feature on the...
The objective of the demonstration is to show 3-axis contouring with Super Geometric Intelligence machining. FORGING AHEAD SNC Demo Summary The objective of the demonstration is to show 3-axis contouring with Super Geometric Intelligence machining. Process...
The whole industry seems to be discussing this topic. Here’s what Modern MachineShop has to say about "Graphite Milling Shifts Into High Gear". GRAPHITE MILLING SHIFTS INTO HIGH GEAR The whole industry seems to be discussing this topic. Here’s what Modern...
A V22 high precision vertical machining center was chosen to machine the part from roughing to finishing. The machining process began with top face roughing of the part using a 15-mm Pokholm face mill at 7500RPM. The outside perimeter was then machined with a 1.3-mm ball-nosed endmill running at 30,000RPM....
A previously outsourced retainer mold featuring 5,700 holes was machined on an EDGE2 Fine Hole using 0.0120 inch diameter hollow, copper pipe electrodes. Each hole required a 0.0132 inch finished hole diameter with a tolerance of ±0.0002 inch. _x000D_ _x000D_ The EDGE2 Fine Hole's precision...
Runoff Requirements 1.67 Cpk Machines 3 A55 / System installation with MMC Tooling 49 tools Special tooling: Step “G” drills and 6 step Mapal reamers Parts Automotive...
THE CHALLENGE Campbell Engineering specializes in producing highly complex, low-volume components, primarily for medical devices. The Lake Forest, Calif., company began to experience growing pains after transitioning its operation from that of a contract machine shop producing prototype...