The A99 horizontal machining center is the latest addition to Makino's highly advanced line of A-Series machining centers. With x, y and z axis travels of 39.4 x 39.4 x 37.4" (1,000 x 1,000 x 950mm) and a spindle speed range from 0 to 12,000 rpm, it is the largest and fastest of the line, which...
MASON, Ohio – June 15, 2018 –Introducing the new UP6 HEAT Wire EDM machine designed for Ultra Precision machining. The new machine is capable of achieving work piece positional accuracies of 1 micron (0.00004”) while providing X/Y/Z travels respectively of 650 x 470 x 320mm (25.59”...
The objective of the MC1010-5X demonstration is to exhibit the combination of thin wall machining and 5-axis contouring. Impeller Part Demo Summary The objective of the MC1010-5X demonstration is to exhibit the combination of thin wall machining and 5-axis contouring....
E. Bud Guitrau has joined the growing staff of Makino as Western Regional Sales Manager for the EDM Group. MAKINO NAMES GUITRAU WESTERN REGIONAL MANAGER Heads Up Regional EDM Sales Group MASON, OH – June 2006 – E. Bud Guitrau has joined the...
Runoff Requirements 1.67 Cpk on critical features Tooling 21 tools Special tooling: finish bore for crankshaft alignment, finish, bearing bore and flange hub O.D., flange undercut, flange chamfer, rough thrust face, rough, semi...
Machines 1 J88 / Stand-alone installation Runoff Requirements 10 continuous pieces Cpk > 1.96 and PC% 51%. Process capability run 32 PC, 8 hours, Cpk > 1.47 and PC% 68% Tooling 9 tools Parts Automotive...
Engine cylinder head (2) Machines 1 A77 5-axis / Stand-alone installation Runoff Requirements 1.67 Cpk on all features Tooling 30 tools Special tooling: High-speed drills (700 sfm), approximately...
Steering Knuckle Tooling 12 tools Special tooling: Combination tool to drill, face chamfer and circle interpolate back side chamfer. 1:6 taper drill. Face and back side debur tool. Machines 24...
Runoff Requirements 10-piece run to 1.96 Cpk. 25-piece run to 1.47 Cpk 50-piece run to 1.47 Cpk and a second 50-piece run to 1.47 Cpk Machines 12 A66 / System installation Tooling 88 tools Special...
Part Cycle Time/Volumes 13.94 minutes / 32,900 parts per year Operation 2, Op 10= 31 features, Op20 = 81 features Machines 3 A55E’s in a Gantry Cell Tooling All fine bores are processed using...